Product name:
Construction of the Lasarte-Hendaya Line. Loiola-Herrera Section
Description:
Construction of 5,508 m of ballastless track, two new stations in the districts of Herrera and Intxaurrondo, renovation of the current track, a new bridge over the Urumea River with no supports on the riverbed and a mined railway tunnel, with length of 1,911 m.
Web: