Design of the Jubail–Dammam–Riyadh–Jeddah railway line. The 1,942 km strategic railway corridor crosses the Arabian Peninsula from east to west. The integrated mixed-use infrastructure will have a design speed of 160 km/h for goods and 250 km/h for passengers.